Westport Chrysler Dodge Jeep Ram Building Pad Construction

• Haul in 20,000 ccy of fill material and construct building pad to design grade

• Install Geotex Fabric on 50% of job site for stabilization

• Construct detention pond, install sanitary sewer and storm drain system

• Place rock on building pad to design grade