This will be replaced with the contents of header.html

Vincennes
University

August 2015: Previous   Next

Vincennes University Parking Lot

• Remove topsoil from designated area

• Cover entire site with Geotex Fabric for stabilization

• Haul in and place 550 tons of #53 stone and grade to specifications

• Install 53 concrete parking bumper on site